May 2011 - Ceilings complete
The latest batch of photos from Bernie. Not too many changes, but the ceilings are all in, and some recessed lighting as well. These photos also show all the pretty closet doors in the bedroom and hall utility area. Looking forward to appliances, countertops, and the rest of the lighting/fans!
I haven't mentioned it before, but Bernie appears to have a very wide-angle lens on his camera, which is great for taking photos of home interiors, but does have the effect of making our condo look much bigger than it actually is. It's a perfect size for the two of us, but smaller than the photos depict.
I haven't mentioned it before, but Bernie appears to have a very wide-angle lens on his camera, which is great for taking photos of home interiors, but does have the effect of making our condo look much bigger than it actually is. It's a perfect size for the two of us, but smaller than the photos depict.
April 2011 - Cabinets are in!
Bernie sent us another batch of photos on my birthday -- what a nice gift! There are some great exterior shots as well as the latest interior shots showing that the cabinets have been installed in the kitchen and bathroom, along with interior doors. The bathroom tiling and glass block work has also been completed, though the ceiling is still open in places, with exposed beams and HVAC runs. Still, it's great to see the progress!
We have also been working on the furniture/household goods package with Lorena at Grand Caribe. Once the last few items are ironed out, we should be able to place the order for our furniture and accessories. Very exciting!
We have also been working on the furniture/household goods package with Lorena at Grand Caribe. Once the last few items are ironed out, we should be able to place the order for our furniture and accessories. Very exciting!
Chico Caribe latest photos - Feb. 27, 2011
We just received these photos from Bernie today, and all I can say is wow! Our condo is really taking shape now, and now that they have moved onto the finish construction, things are moving much more quickly. I feel so incredibly fortunate that it is soon to be ours. Pinch me, because I can barely believe it!
Earlier in February...
The work on Chico Caribe continues. Since our trip in August, a lot of progress has been made. The interior of the condo is still not finished, but they've made huge progress on the overall building. All four floors are completely built, the roof is on, the elevator shaft is complete, the garages have been built (although we're not getting one), and the exterior has been stuccoed. Windows are in (except the glass block in the bathrooms), and the balconies have railings. What's more, the pool has been dug and concrete laid down. Woo-hoo!
In our unit, the recent work has been the ducting, which is extensive and requires dropping the ceiling since all the walls are concrete, the wiring, and the rough plumbing. We can definitely see the progress and are getting more excited every day, especially since we have been suffering through the winter snows, ice, and cold.
In our unit, the recent work has been the ducting, which is extensive and requires dropping the ceiling since all the walls are concrete, the wiring, and the rough plumbing. We can definitely see the progress and are getting more excited every day, especially since we have been suffering through the winter snows, ice, and cold.
February 2011
The pool...ah, yes
December 2010
|